Client

SDC Construction for Northampton College

Cost

£290,000

Duration

8 Weeks (including factory production and site works)

The client required a versatile bespoke modular option which could be assembled together and disassembled for re-use in a different location. Integra’s modular buildings versatility allows a range of options from 1 to 4 storeys. The 18 bay, three storey building was designed for use as site accommodation during construction works for Northampton College.

Bespoke specification:

  • Range of open plan, single and double offices
  • Various sized meeting rooms
  • Kitchen and WC facilities
  • Bays can be re-sited as single, double, 3 or 4 storey buildings
  • Each bay has a suitability designed roof to stand alone or as the top floor, and each can hold bays placed above
  • Plastisol exterior with UPVC double glazed windows
  • Internal partitions are demountable for future flexibility